Expanding Our Testing Capabilities: Introducing the New Vos Prodect Testing Tower!

Keeping Up with Industry Growth

As offshore wind farms expand in size, depth, and complexity, the engineering challenges surrounding subsea cable installations continue to evolve. With cable diameters increasing, higher project loads and installations reaching greater water depths, the demand for stronger, more reliable cable hang-off systems has never been greater.

At Vos Prodect, we are committed to engineering excellence and continuously evolving to meet these growing demands. A key part of ensuring the reliability of cable hang-offs is conducting design verification tests, which validate their performance under real-world offshore conditions.

With an increasing number of projects requiring cable specific verification tests, from temporary hang-off section tests to final cable hang-off armor wire clamp tests, we have taken proactive steps to expand our testing capabilities.

Introducing the New Vos Prodect Testing Tower

To accommodate the increasing demand for design verification testing, we have constructed an additional testing tower at our facility in the Netherlands. This new infrastructure allows us to:

  • Expand our testing capacity to meet growing industry needs
  • Accommodate larger cable diameters and higher load demands
  • Perform both temporary and final cable hang-off tests under extreme conditions
  • Validate our engineered solutions for deeper water installations

The ability to rigorously test cable hang-offs before offshore deployment is critical in optimising installation efficiency and minimising costly vessel time offshore. By verifying load performance in a controlled environment, we provide project teams with the confidence that Vos Prodect cable hang-offs are ready for offshore conditions.

Engineering Solutions That Drive Offshore Success

As the offshore wind industry continues to push boundaries, we at Vos Prodect remain dedicated to providing innovative, high-quality subsea solutions. Our expanded testing capabilities reinforce our commitment to ensuring that every cable hang-off system we engineer meets the highest performance and safety standards.

With the new testing tower now operational, we are ready to support upcoming projects worldwide, delivering tailored cable protection and hang-off solutions that withstand the challenges of modern offshore installations.

For more information about our enhanced testing capabilities or to discuss your upcoming offshore project requirements, contact us today!